My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124434
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:00 PM
Creation date
11/25/2007 12:38:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999038
IBM Index Class Name
Permit File
Doc Date
9/20/1999
Doc Name
ROWE GRAVEL FN M-99-038 NEW 110C APPLICATION ADEQUATE FOR APPROVAL
From
DMG
To
ROWE GRAVEL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />________________________________________________________________________ <br />Subtotal (K): <br />L. DRILL NOLE/MONITORING DELL SEALING <br />Task No. Task Description <br />Cost (E) <br />Subtotal (L ): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Cast (E) <br />b ~ Demolition <br />7 ~ Seeding Per attached worksheet. 51,975 <br />8 ~ Fencing 400' 4 strand 6a rbed a E1.65/l.f. ~ E660 <br />9 ~ Mob/Demob Per attached Norksh eet. ~ E567 <br /> Subtotal (M ): E3, 202 <br />TOTAL DIRECT RECLAMATION COSTS (subtot als A through M): E4,198 <br /> <br />II. INDIRECT COSTS <br />___________________________________________ _ <br /> <br />__________________ ___________ <br /> <br />___________ <br />_ ______________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT __________________ ___________ <br />Item No.~ Item Description <br />________ <br />_________ <br />_ ~ Cost (E) <br />I <br />_ <br />_______________________ <br />1. ~ Public Liability Insurance.... ________________I_ <br />1.550% of dir. ___________ <br />E65 <br />2. I Contractor's Performance Bond 1.550% of dir. E65 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ E420 <br />4. ~ Job Superi ntendent..Equip. oper. <br />___________________________________________ serves as super.) <br />__________________ <br />__ <br /> <br />Subtotal (A ): _________ <br />E550 <br />TOTAL CONSTRUCTION CONTRACT AMWNT (di rect plus 0 & P): E4, 748 <br /> <br />B. DMG PROJECT ADMINISTRATION E%PENSES _ ___________ <br />Item No.~ Item Description <br />________I__________________________________ ~ <br />________________I_ Lost (E) <br />___________ <br />1. I Minerals Program Adm <br />_________________________________ 5.00% of cntr.l E237 <br />__________ <br />NET INDIRECT COST PERCENTAGE: 18.76% <br />__________ __________________ <br />Subtotal (B): <br />_ ___________ <br />E237 <br />___________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtot als A through B): E787 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E4,986 <br />
The URL can be used to link to this page
Your browser does not support the video tag.