My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124434
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:00 PM
Creation date
11/25/2007 12:38:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999038
IBM Index Class Name
Permit File
Doc Date
9/20/1999
Doc Name
ROWE GRAVEL FN M-99-038 NEW 110C APPLICATION ADEQUATE FOR APPROVAL
From
DMG
To
ROWE GRAVEL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br /> <br />Task M : 001 State : Coloratlo PermiVjobit : M-99-038 <br />Dale : 09/01H9 County : La Plara Abhrevialion :none <br />User : SSS Sile :Rowe Gravel Filename : M03B-001 <br /> <br />Permit or other job action :New Application <br /> <br />Task description :Reduce highwall to 3:1 grade <br /> <br />HOURLY EQUIPMENT COST Basic machine : Car D8N (1996) Horsepower : 285 <br />Blade type : Semi-Universal <br />Adachment no. 1 : ROPS Cab Shid basis : 1 per day <br />Adachment no. 2 : 3-shank ripper <br /> <br /> Utilization 4o Cost data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : 541. f0 NA <br />Operating cost/hour : 855.64 100 <br />Ripper op. cosUhour 40.69 <br />Operator cosVhour: 523./2 <br />Total unit cosVhour : 4120.55 <br />f0 <br />NA <br />Total goal cosghour : .$120.55 <br />Initial Swell Loose <br />volume: 4,167 LCY laclor: NA volume: 4,187 LCY <br />Source of quantity take-od : 750' x 20' highwall bac~lled to 3:1 <br />Source of est. swell laclor : NA <br />HOURLY PRODUCTION <br />Joh Condition Correction Factors <br />Average push distance : 55 leel Source <br />Unadjusted hourly production : 1126 LCY/hr <br />Material consistency description <br />Oadly rnnmlidarai srnc4nilu <br />Average push gradient : 76.50 % (neg) <br />Average rile altitude : 6,600 leet <br />Material weight : 2,400 Ibs/LCY <br />Material weight description <br />ruv anA nravnl. nrV <br />JOB TIME AND COST <br />Fleet size: 1 Dozers) <br />Unit cost : 40.111 /LCV <br />Operator skill : 0.75 (avg <br />Material consistency : 1.10 (Carl <br />Dozing method : 1.20 (s/o <br />Visibility : 1.00 (avg <br />Job eRciency : 0.83 (1shiR/ <br />Spoil pile: 0.90 (ssd <br />Push gmdienl: 1.36 (Carp <br />adwae: 1.00 (cau <br />Material weight : 0.96 (Cat h <br />Blade type : 1.00 (S or <br />Net correction : 0.96 <br />Adjusted unit production : 1086.18 LCY/hr <br />Adjusted fleet production : 1,084.18 LCY/hr <br />Total job time: 3.64 Hours <br />Total job cost: E48J <br />
The URL can be used to link to this page
Your browser does not support the video tag.