Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHNORK - STREAK CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />________________________________________________________________________ <br />Subtotal (H): <br />____________ <br />I. EART HNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No. Task Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />4 ~ Task removed...dam construction to create a stock <br />pond would not occur under a permit revocation <br />and bond forfeiture scenario. Costs have been <br />calculated for revegetati on of the pit area. <br />Subtotal (1 ): <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No. Task Description ~ Cast (S) <br />________I__________________________________________________I___________ <br />5 ~ Replace topsoil to a 6" depth on pit area. ~ 5151 <br />Subtotal (J ): 5151 <br />