Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :OMG <br />003 State :Colorado <br />02/24/2004 ~ County :HueAano <br />LDO Site :Velarde Pit <br />Permit/job # :M-2002-118 <br />Abbreviation :none <br />Filename :M118-003 <br />Permit or other job action :Reclamation Cost Est. New 112C Permit Application <br />Task description :replace 6 inches topsoil on 20 ac. <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 637G <br />-Push dozer :INA <br />Support equipment-Load area :INA <br />-Dump area :NA <br />Road maintenance -Motor grader :INA <br />-Water truck :INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $72.79 NA NA NA NA NA <br />Operating cosUhour : $162.12 NA NA NA NA NA <br />Ripper op. cosUhour : NA NA NA NA NA NA <br />OperatorcosUhour: $25.43 NA NA NA NA NA <br />Unit subtotals : $260.34 NA NA NA NA NA <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals : Work : $260.34 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : x260.34 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 16,133 LCY factor: NA volume: 16,133 LCY <br />Source of quantity take-off :Exhibit E <br />Source of estimated swell factor :NA <br />