My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124142
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:45 PM
Creation date
11/25/2007 12:19:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002118
IBM Index Class Name
Permit File
Doc Date
2/25/2004
Doc Name
Second Adequacy Review
From
DMG
To
LJ Development
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Caoacity <br />Basis <br />Material weight: 2,550 pounds/LCY <br />Material descdption <br />Earth -Dry packed <br />Rated payload : 75,000 pounds <br />Payload capacity : 29.41 LCY <br />Bowl (volume) Basis <br />sheet 2 of 2 <br />Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY "' <br />production reflects volume per scraper pair on push-pull models <br />Cvcle Time : ob Condition Corrections : Site altitude (ft.) : 6,160 <br /> Scraper Push dozer Source <br />Scraper loading time' : 1.80 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency • 0.830 NA (Cat HB) <br />• load time per scrper pair an push-pull models Net CArfeCflon : 0.830 NA <br />Travel time <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haut Route <br />Seg. # Haul distance (feet) Grade (°/a) Roll. res. (°~) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 800 4.00 5.00 9.00 1042 0.81 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />table velodGas are max. attainable per total resistance shown, nol average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.69 <br />Unadjusted unit production/hour : 422.63 LCY/hour "' Adjusted forjob conditions : 350.78 <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 1 <br />Adjusted single scraper team (unit) hourly production : 350.78 <br />Adjusted multiple scraper team (fleet) houdy production : 350.78 <br />Haul time : 0.81 minutes <br />minutes <br />minutes <br />LCY/hour <br />scraper(s) <br />LCY/hour <br />LCY/hour <br />.,, <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 45.99 Hours <br />Unit cost : 50.742 /LCY Total job cost : $11 <br />" Vavel time for each segment is adjusted for acceleretloNdeceleretion. Return time : 0.48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.