Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 02/24/2004 <br />User : LDO <br />State :Colorado <br />County :Huen`eno <br />Site : Ve/arde Pit <br />Permit/job # :M-2002-118 <br />Abbreviation :none <br />Filename :M118-002 <br />Agency or organization name :DMG <br />Permit or other job action :Reclamation Cost Est. new 112c <br />Task description :scarify 5 ac. sfockpile/process area <br />Basic machine :Cat D8R Series 11 - 8U <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 5.00 acres Rip depth (ft) : 1.50 Volume : 12,100 BCY or CCY <br />Source of estimated quantity :Exhibit L <br />Source of estimated load factor :NA <br />,: <br />HOURLY PRODUCTION <br />Altemate methods - <br />Selsmic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cU. yds./hour <br />Area : Avg. ripping depth : 1.50 feeVpass <br />Average ripping width : 7.08 feeUpass <br />Average ripping length : 225.00 feeUpass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver tlme : 0.25 minutes/pass <br />Production per unit area : 0.782 acres/hour <br />Unadjusted production : 1,891.82 cu. yds./hour <br />Unadjusted production <br />per selected method : 1,891.82 cu. yds./hour <br />Site altitude : 6,160 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 1,570.21 cu. yds./hour <br />>d}usted fleet production : 1,570.21 cu. yds.lhour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total }ob time <br />Unit cost : $0.099 per cu. yd. Total job cost <br />Selected estimating method : Area <br />Horsepower: 310 <br />Shift basis : 1 per day <br />7.71 hours <br />$1 <br />