My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-08-20_PERMIT FILE - C1980007
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2006-08-20_PERMIT FILE - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2018 12:42:24 PM
Creation date
11/25/2007 12:10:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/20/2006
Doc Name
Special Provisions
Section_Exhibit Name
Exhibit 75 SGARE Appendix B
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~i i~ <br />203.13 <br />(c} Rock Fill. Rock fill will be measured as the volume in cubic yards in its final <br />position, unless otherwise specified, and shall be limited to the elevations <br />specified. <br />(d) Blading and Dozing. The quantity measured under blading and dozing will be <br />[he number of hours that each motor grader or bulldozer is actually used as <br />ordered. A minimum of four hours for any half shift or part thereof will be paid <br />for unless the equipment is inoperative due to breakdown or other causes <br />determined to be the Contractor's responsibility. Time involved in moving onto <br />or off the project will not be measured and paid for. <br />Time will be paid for moving motor graders or bulldozers from one location on <br />the project to another, if directed; but time will no[ be allowed for moves which <br />are made for [he convenience of the Conhac[or. <br />Payment for a minimum of four hours will not be allowed in cases where the <br />motor grader, bulldozer, or operator is assigned to work on other pay items <br />connected with the project. <br />(e) Potholing. Potholing will be measured by the total number of hours [hat <br />excavation and backfilling equipment is actually used as directed. All other <br />related work, including removal of existing pavement, backfilling, shoring, and <br />• labor will not be measured and paid for separately, but shall be included in the <br />work. <br />(f) Proof Rolling. Proof rolling will be measured by the actual number of hours <br />that the pneumatic equipment is used as a proof roller. <br />The time to be measured under this item will be the number of hours that each <br />piece of equipment is actually used as ordered. <br />Proof rolling will be measured and paid for only once. Additional proof rolling <br />shall be a[ the Contractor's expense. <br />BASIS OFPAYMENT <br />203.14 The accepted quantities will be paid for at the contract unit price for each of <br />the pay items listed below that appear in the bid schedule. <br />Payment will be made under: <br />Pay Item Pay Unit <br />Rock Excavation Cubic Yard <br />Rock Fill Cubic Yazd <br />Unclassified Excavation Cubic Yazd <br />Unclassified Excavation <br />(Complete in Place) Cubic Yazd <br />• 14S <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.