My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-08-20_PERMIT FILE - C1980007
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2006-08-20_PERMIT FILE - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2018 12:42:24 PM
Creation date
11/25/2007 12:10:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/20/2006
Doc Name
Special Provisions
Section_Exhibit Name
Exhibit 75 SGARE Appendix B
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~i <br />203.14 <br />Pay Item (cont.) Pay Uni[ (cont.) <br />Muck Excavation Cubic Yard <br />Borrow Cubic Yard <br />Borrow (Complete in Place) Cubic Yard <br />Embankment Material <br />(Complete in Place) Cubic Yard <br />Stripping ~ Cubic Yazd <br />Blading Hour <br />Dozing Hour <br />Potholing Hour <br />Proof Rolling Hour <br />Water will not be measured and paid for separately but shall be included in the work. <br />Compaction will not be measured and paid for separately, but shall be included in the <br />work. <br />Excavated materials which, when specified, require more than one handling prior to <br />final placement will be paid for at the contract unit price for unclassified excavation, <br />rock excavation, stripping, muck excavation, or borrow as appropriate, for the first <br />approved handling. Payment for the second approved handling will be made at the <br />same unit price as the firs[ handling, except that material used in conjunction with <br />• another pay item wiil be paid for in that pay item. <br />Payment for Unclassified Excavation (Complete in Place), Embankment Material <br />(Complete in Place), and Borrow (Complete in Place) shall be full compensation for <br />all work necessary to complote the item including construction of embankments, <br />unclassified excavation, borrow, compaction, compaction of bases of cuts and fills, all <br />work in available materials pits, and disposal of excess excavated material. <br />All costs associated with reducing the size of the claystone particles, removing the <br />oversized particles, and disposal of the oversized particles will not be paid for <br />separately but shall be included in the work. <br />Pavement replacement if required due to potholing, shall be accomplished, measured, <br />and paid for in accordance with appropriate sections of the specifications. <br />Pneumatic tire equipment and load required to achieve the desired weight of proof <br />rolling equipment will not be measured and paid for separately, but shall be included <br />in [he work. <br />• <br />149 <br />i~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.