My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-08-20_PERMIT FILE - C1980007
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2006-08-20_PERMIT FILE - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2018 12:42:24 PM
Creation date
11/25/2007 12:10:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/20/2006
Doc Name
Special Provisions
Section_Exhibit Name
Exhibit 75 SGARE Appendix B
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />203.13 <br />When scarifying is specified [he motor grader shall be equipped with an independently <br />operated "V"type scarifier and attachments. <br />203.12 Dozing. Dozing shall consist of famishing crawler-type tractors of the <br />specified horsepower rating, complete with operators and bulldozer blades. Rippers, <br />if specified, will not be measured and paid for separately, but shall be included in the <br />work. <br />METHOD OF MEASUREMENT <br />203.13 Items paid for by volumc will not be remeasured but will be the quantities <br />designated in the Contract. Exceptions will be made when 5eld changes are ordered or <br />when it is determined that there aze discrepancies on the plans in an amount of at least <br />plus or minus two percent of the plan quantity. <br />(a) Excavation. When payment is specified on a volume basis, all accepted <br />excavation and borrow will be measured in its original position by cross- <br />sectioning [he azea excavated. These measurements will include authorized <br />excavation of rock, shale, muck, or other unsuitable material. All accepted <br />stripping will be measured in stockpiled locations by cross-sectioning. <br />When the excavation conforms to the staked lines and grades, the original cross- <br />. sections and the staked sections shall be used for the determination of volumes <br />excavated. Volumes will be computed from the cross-sections by the average end <br />area or other acceptable method. <br />When topsoil or wetland topsoil is included as a pay item and is specified, the <br />measured volume of excavation will be reduced by the volume of topsoil or <br />wetland topsoil removed from the azea shown as excavation on the plans. <br />Measurements will include over-breakage in rock excavation from the <br />backslopes to an amount not to exceed, in any half station of 50 feet, 10 percent <br />of the actual quantity required for that half station. <br />(b) Embankment. If provided in the Contract, embankment material will be <br />measured in its final compacted position in the roadway. Measurement will be <br />made upward from the original ground line without any allowance for subsidence <br />due to compaction of the base under the embankment. The original cross- <br />sections will be used for determination of volumes of embankment material <br />placed, unless changes have been directed. <br />The measured volume of embankment material will be increased by the volume <br />of topsoil or wetland topsoil removed from the area below the original ground <br />line and under the embankment, only when the topsoil or wetland topsoil is <br />designated to be removed within the roadway prism. When the topsoil source is <br />not designated in the Contract, embankment will be measured from [he original <br />ground line. <br />• <br />147 <br />~~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.