My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123540
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:17 PM
Creation date
11/25/2007 11:39:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Section 3.0 Performance Bond Requirements
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3.02.2-11 <br />Loreucito Canyon Mine Year One Bond Calculation Summary <br />Reclamation Area Task Description Material Quantity Unit Total <br />JejJCunyon f/nul Rund Rerfmnuriorr <br />JeJjCnnyon Topsuil Piles <br />Hun' Conl Lonrl-Our Facilir}' <br />assurnplions: <br />lniturl fill deplir = 3' <br />Rraprend = ll"o~lnpsnil <br />I. Backfill drainage ditches Rough grade stripped windrow into <br /> drainage ditch <br />2. Motor grader, rip haul road base 180 hp dozer, tilUboulder clay/claypan <br />3. Topsoil respread 300 hp dozer, 150' haul <br />4. Fertilizer, seed, mulch Hydro-seeder <br />1. Motor grader, np stockpile base to 140 hp dozer, till boulder clay/claypan <br />re lieve compaction <br />2. Final grading of site Motor grader, fine grade <br />3. Fertilizer, seed, mulch Hydro-seeder <br />1. Remove (F. E. Loader) initial fill <br />volume <br />2. Truck/haul fill <br />3. Haul fi respread topsoil <br />4. Reclaim side ditches <br />5. Fertilizer, seed, mulch <br />G. Clean sediment Crom pond <br />7. Rcsprcad topsoil an pond footprint <br />5 CY F.E. I-oader <br />42 CY dump truck <br />300 hp dozer, 150' haul topsoil respread <br />(assume I I ") ' <br />Rough grade stripped windrow into <br />drainage ditch <br />Hydro-seeder <br />2.0 CY track backhoc <br />300 hp dozer, 50' haul <br />8. hiual grade ponds Motor grader; fine grade <br />9. Fertilizer, seed, mulch pond footprint Hydro-seeder <br />3.2 <br />12111 SY <br />8267 CY <br />7713 CY <br />6 AC <br />Total <br />8906 CY <br />29040 SY <br />6 AC <br />Total <br />33880 CY <br />33880 CY' <br />10352 CY <br />6697 SY <br />7 AC <br />2420 CY <br />739 CY <br />2420 SY <br />$1,937.78 <br />$6,448.00 <br />$9,410.27 <br />$9,319.23 <br />$27,115.27 <br />$6,946.37 <br />$3,775.20 <br />$9,931.68 <br />$20,653.25 <br />$32,524.80 <br />$75,891.20 <br />$8,695.87 <br />$870.57 <br />$11,586.96 <br />$3,775.20 <br />$421.48 <br />$314.60 <br />0.5 AC $827.64 <br />Total $134.908.32 <br />d~ <br />(revised 12/20/01) <br />
The URL can be used to link to this page
Your browser does not support the video tag.