Laserfiche WebLink
Table 3.02.2-11 <br />Lorencito Cam~on Mine fear One Bond Calculation Summary <br />Reclamation Arca Task Description Material Quantity Uni[ To[_al <br />JeffCagt'on SYrrface Afirre <br />Wrn~sr Case Disturbance Assumptions 1. Remove topsoil from knob above cut 300 hp dozer, 300' haul <br /> 5916 CY $7,216.98 <br />Ma.r.dishn'bunreorea 78 r crc:c (( 2. Push spoil to hollow fill 300 hp dozer, 300' haul 245100 CY '$299,022.00 <br />ucres jrorn yr / rec/niurer/) 3. Load truck to haul 992G Front End Loader 294800 CY $29,480.00 <br />Marimwn fl/area = 599900 C'}" 4. Haul fill to backllll GO C.Y. dump, 1000' haul 294800 CY $583,704.00 <br />Respmurl = J 1 " ojtopsail'1 5. Spread fill 300 hp dozer, 300' haul 294800 CY ~ $359,65G.00 <br />II G. Rough grade Rough grade 193600 SY $30,976.00 <br /> 7. Load topsoil to truck 9926 Front End Loader 99086 CY $9,908.56 <br /> 8. Haul topsoil to dump 60 C.Y. dump, 1000' haul 99086 CY $196,]89.40 <br /> 9. Spread topsoil 300 hp, 300' haul 105001 CY $128,10136 <br /> !0 . Fertilizer, seed, mulch Hydro-seeder 86 AC $141,52G.44 <br /> ~ Total $1,785,780.73 <br />Reclaim Drill 1foles anr! hlmritoring <br />Neils <br /> I. Seal 30 drill holes and monitoring <br /> wells 30 EA ~ $107,250.00 <br /> - Total $107,250.00 <br />Mabilimtion & Drnmbifiza[ion U~onr <br />Pueblo/ <br /> D-9 Bull dozer n. 6 ". 6 EA $6,960.00 <br /> 16G motor grader n) 4 4 EA $4,640.00 <br /> 992D Front eud loader L 2 2 EA $2,320.00 <br /> 2.0 C.Y. Track Backhoe @ 2 2 EA $2,320.00 <br /> 60 C.Y. Dump tnrck n 6 G EA $6,960.00 <br /> Total $23,200.00 <br />.Sediment Ponrlc (}"enr 2002) .. <br />,4scumpria+.r ] . Clean sediment from ponds 2.0 CY track backhoe 19360 CY $30,201.60 <br />Rcurnve 9 ponds (0070, i/qS, 009. 2. Respread topsoil 300 hp dozer, 150' haul <br />009x) 5916 CY $4,969.07 <br />Remove 3 jeer ojseriimr~nr per pwrd 3. Final grade ponds Motor grader, fine grade <br /> 19360 SY $2,816.80 <br /> 4. Pertdizer, seed, mulch Hydro-seeder 4 AC $6,621.12 <br /> Total $44,308.59 <br />'Fo[al Direct Reclamation Cosls 2002 $2,143,216.15 <br /> 3.3 ~-~ 7 <br /> ( revised 12/20/Ol~ <br />