Laserfiche WebLink
~~ -~ i ~f~^ <br />QlQ /6t/~iv~ <br />~ - /~-~~ <br />Rule 3: Pe7armancr Bore( Requiremerua <br />• • The balance necessary fill material will be truck-hauled from Fill 009 as '~ 9 <br />necessary to achieve the final contour. b„~- ~ 3-i0. 0Fl ~ <br />1S [255` b~;l~ <br />• The topsoil pile for this mine area is located immediately east of the Year 1 <br />mine area and will contain about 100,000 LCY. <br />Table 3.02.2-12 summarizes assumptions and cost estimates for additional reclamation <br />bond increments at the end of Year 3 and the end of Year 4 (maximum exposure during <br />first 5-year mining period). Tables 3.02.2-13 and 3.02.2-14 summarize calculations for the <br />Year 3 and Year 4 estimates. The physical model detailed for Year 1 is very similar to the <br />model used for Years 3 and 4, adjusted for the volumes and areas listed on Table 3.02.2- <br />12. <br />3.02.3 Period of Liability for Performance Bond <br />LCC will post a surety bond for the duration of the coal mining and reclamation operations <br />and fora 10-year period following reclamation. <br />3.02.4 Form, Conditions, and Terms of Performance Bonds <br />• LCC will post a surety bond prior to permit issuance which will comply with the conditions and <br />terms of this Rule. <br /> <br />3-lb (revised 9/12/01) <br />