My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123070
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:55 PM
Creation date
11/25/2007 11:05:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
7/2/2007
Doc Name
Preliminary MC.SPCC Plann & Emergency Response Plan
From
Energy Fuels
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WhirlwindMtne Page8of8 <br />MC /SPCC 0629/07 <br />Section 6.0 -Implementation <br />MC /SPCC structures and controls will be implemented as the mine facilities are constructed. <br />The current mine facilities presenting a potential spill source are listed below - <br />• The fuel depot currently consists of one 500-gallon "farm" tank for diesel fuel set up in a <br />galvanized steel secondary containment basin. <br />• The fuel tank for the temporary mine generator currently consists of one 500-gallon <br />"farm" tank for diesel fuel set up in a galvanized steel secondary containment basin. <br />Section 7.0 -Specialist Clean-up Personnel <br />The following personnel are off-site specialists who are available for clean-up and <br />decontamination activities if a spill occurs at the Whirlwind Mine. <br />. Timothy W. Pierce, Technical Services Supervisor (Hazardous Materials) <br />970-864-7775 <br />Jess Fulbright, Occupational Safety /Hazardous Materials <br />970-864-7775 <br />Frank Files, Enduonmental Manager (Hazardous Materials and Petroleum Products) <br />303-974-2140 <br />Section 8.0 -Periodic Review and Updating <br />The Materials Containment /Spill Prevention, Control and Countermeasures Plan will be <br />reviewed and updated, as necessary, when changes to the facility layout and materials in use <br />occur. <br />Process modifications and facility changes will be reported to the Technical Services <br />Supervisor for review prior to their implementation. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.