Laserfiche WebLink
a <br />a <br /> c. & d. Topsoil will not be stockpiled except in the berm at <br /> the north boundary. The materials will not be rehandled <br /> until they are to be used in reclamation work at cessation <br /> of mining. <br /> e. Overburden will be properly graded and roughened to <br /> ensure stability of the reconstructed slopes. <br /> f. Native topsoil will be the only medium used. <br /> g. The topsoil will be spread evenly throughout the <br /> reclaimed areas. Fertilizer will be applied as neces- <br /> sary. See Section 6.5 for discussion of the type of <br /> revegetation anticipated. <br /> <br /> h. No vegetative piles are anticipated. <br />6.5 Revegetation <br />a. Revegetation is a part of the reclamation plan. <br />After grading and leveling, planting and seeding will be <br />initiated as soon as practicable. No tree and shrub <br />species will be used. All slopes will be seeded with the <br />a following seed mix (which is expanded from the Soil <br />Conservation Services recommendation, Appendix B): <br /> Species PLS/Acre <br /> 12 <br />8 <br /> Western wheatgrass . <br /> Sideoats grama 3.6 <br /> Needle-and-thread 1.8 <br />a Little bluestem 3.6 <br /> Prairie sandreed 3.6 <br /> <br /> Blue grama 2.4 <br />E-7 <br />