Laserfiche WebLink
0 <br />0 <br />a 1. Water will be trucked in to handle plant and <br /> personal needs. <br /> 2. The operator will comply with any Federal and <br /> State regulations governing water quality. <br /> <br /> 3. There are no dredge and fill requirements <br /> that pertain to this operation. <br /> 4. This operation will require no additional <br /> large siltation structures from drainways. <br /> b. No earth dams will be constructed. <br /> <br /> 6.3 Wildlife <br /> Impacts on local wildlife populations are expected to be <br /> negligible. Exhibit H presents pertinent wildlife data. <br /> 6.4 Topsoiling <br /> t <br />it <br />d <br />t <br />di <br />h <br />il <br />i <br />h <br /> a. opso <br />e <br />s an a <br />equa <br />e growt <br />me <br />um <br />T <br />e <br />on s <br /> and no mixing salvaged topsoil, overburden, animal manure <br /> and mulched vegetation is anticipated. The backfilling <br /> and leveling operation will include dispersing topsoil <br /> to a minimum depth of between 8 and 12 inches over the <br /> a tabli <br />nt of a <br />rot <br />to b <br />r <br />d <br />id e <br />hm <br />c- <br />l <br />i <br />R <br /> are . <br />p <br />s <br />e <br />ec <br />a <br />me <br />ap <br />s <br />s <br />e <br />e <br /> tive vegetative cover including native seed mix will pre- <br /> vent wind or water erosion on the berm until redistribu- <br /> tion at end of mining. <br /> b. No woody vegetation exists at the site. <br /> <br /> <br />E-6 <br />