Laserfiche WebLink
<br /> <br />a b. No portion of this area will be reclaimed as forest <br /> land. <br /> c. The area will be reclaimed as open-space range and <br /> will be reduced to slopes compatible with the surround- <br /> t <br />i <br />h <br /> ng <br />opograp <br />y. <br /> d. Environmental factors have been considered in the <br /> chosen reclamation plan. Exhibit K contains the clima- <br /> tological data which was considered. Soil information <br /> is contained in Exhibit I. Any expected slope instabil- <br />R c <br />durin <br />l <br />bili <br />d b <br />ti <br />ill b <br />d <br />t <br />t <br />i <br />~J e <br />y s <br />a <br />ze <br />ompac <br />on <br />g <br />e a <br />equa <br />y <br />ty w <br /> the grading operations. Further, surface stability will <br />be provided by the vegetation as it becomes established. <br />e. All proper methods and techniques normal to site <br />preparation and protection for agriculture will be <br />followed in order to establish vegetation in accordance <br />with the reclamation plan. <br />f. If necessary, weed control will be accomplished by <br />mechanical means. <br /> g. Fire lanes are not considered to be necessary. <br />a ill <br /> h. Haul roads and the production plant area w <br />be re- <br /> claimed along with the rest of the area upon completion <br /> of mining. <br /> i. No adverse surface characteristics are expected. <br /> <br />Q <br />E-8 <br />