My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122596
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122596
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:34 PM
Creation date
11/25/2007 10:33:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
Permit File
Doc Date
4/13/2004
Doc Name
110c Appl.
From
Oldcastle SW Group Inc. dba Four Corners Materials
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The worst case cost for reclamation of the site will occur when the mine reserves have been fully <br />depleted, and a highwall width of 250 feet must be backfilled from 2H:1 V to 3H:1 V. For a height of <br />23 feet, this will require the difference of 793 sq.ft (3:1) and 529 sq.ft. (2:1), which is 264 sq. ft. <br />This azea x 250 feet length = 2449 cy. The shelf wetland of 0.40 acres must be created and all top- <br />soil must be replaced on the land from 5' below water level and above. The entire topsoiled azea <br />would need to be seeded, mulched and fertilized. The stages of the reclamation plan and the worst <br />case reclamation costs are given below: <br />Worst Case Reclamation Costs and Timetable <br />Task # Description Time (days) Cost <br />1 After removing all portable facilities, backfill 3 $2,204 <br /> slope from 2:1 to 3:1 for length of 250 feet. Use <br /> excess overburden in the temporary stockpile lo- <br /> cated in the pit area itself from stripping the Phase <br /> 2 area. 2449 cy @ $0.90 per cy <br />2 Remove concrete bridge supports and use 980 3 $2,800 <br /> Loader to remove 2 bridge sections. Smooth out <br /> gravel berms and support areas. <br />3 Create shelf wetland surface on north side of lake 2 $968 <br /> (0.40 acres) Doze 3' of existing fill (1936 cy) @ <br /> $0.50 per cy. <br />4 Spread topsoil on reclaimed area and truck ramps 3 $2,942 <br /> from stockpile 3.6 acres @ 8 inch average thick- <br /> ness (3872 cy) Avg. push dist = 250 feet @ -2% <br /> grade. Use D-8 w/universal blade. Cost is <br /> $0.76lcy. <br />North Fork Pit March 04 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.