Laserfiche WebLink
5 Final grading and harrowing of topsoil, upper <br />zone only, (3872 cy @ $0.38/cy). 5 $1,471 <br />6 Seed 8c mulch wetland (0.52 acres @ $3500/acre) 2 $1,820 <br />7 Seed, mulch, fertilize (3.6 acres@ $1000/acre) <br />Drill seed on flat azeas. Mulch at 3000 Ibs per <br />acre. 2 $3,600 <br /> Total Direct Costs 20 days $15,805 <br /> DMG Costs (19.5% x direct costs) $3,082 <br /> Total Bond Amount $18,887 <br />There are no costs for removal of equipment since there will be no permanent equipment, structures <br />or foundations within the permit azea. DMG overhead consists of contractor profit, bid preparation, <br />etc and aze estimated at 19.5% of direct costs. <br />Map Exhibit E-2 shows the site after full reclamation. The cross-section lines A and B are used to <br />show the original and final topography. These cross-sections are given on Map E-3. <br />The revegetation seed mix for the wetlands was designed to provide a healthy wetland that can be <br />used by all types of wildlife. Cattails, sedges and rushes will invade the site naturally and will add to <br />the diversity of the wetland. <br />The seed mix for the wetland edge of the lake is given below. This mix will be applied on approxi- <br />mately 0.64 acres. <br />North Fork Pit March 04 31 <br />