Laserfiche WebLink
Section 8I6.43(b) Continued. <br />As shown in Exhibit 42,-Drainage. and Sediment Control Plan, portions <br />of Ditches 6-1, I-3 and I-5 will be lined with rip-rap to prevent <br />erosion. In addition, the discharge point of ditches I2 and N2 will <br />be lined with rip-rap to prevent erosion in the receiving stream. <br />Before being released from the permit area, runoff from disturbed <br />areas will be passed through a sedimentation pond. <br /> <br /> <br />816-39 bbbR Revised - January, 1991 <br />