Laserfiche WebLink
BN O1 LOADOUT <br />~r_ <br />2.05.4 Reclamation Plan <br />The Burlington Northern Railway Company desires that the land <br />be reclaimed to industrial use and left as a coal loading <br />facility or storage area. No topsoil distribution and revege- <br />tation is to be undertaken upon closing the leases. <br />The sump on the lease site should remain as sediment control <br />structures. A11 coal handling equipment is to be removed and <br />hauled away, and the area regraded to approximate original <br />contour (level ground). <br />The description of the removal of all coal handling structures <br />and the associated cost of_removal is given in 2.05.3 (7) Coal <br />Handling Structures. <br />© A summary oC reclamation costs is given below: <br />Removal of structures <br />Truck dump hopper $2,600.00 ; <br />Feeder 500.00 <br />36-inch conveyor 2,800.00 <br />Storage Shed 150.00 <br />Sub-total $6,050.00 <br />Overburden Handling (from following page) <br />Overburden Removal 862.00 <br />Regrading 895.00 <br />Sub-total $1,757.00 <br />Total $7,807.00 <br />Timetable <br />Reclamation will commence when the Re[oncrcekMinc closes. <br />Revised 5/93 ' <br />65g <br /> <br />