Laserfiche WebLink
• <br />BN Nl LOADOUT <br />2.05.4 Reclamation Plan <br />The Burlington Northern Railway Company desires that the land be reclaimed to industrial use <br />and left as a coal loading facility or storage area. No topsoil distribution or revegetation is to <br />be undertaken upon closing the leases. <br />All coal handling equipment is to be removed and hau]ed away, and the area regraded to <br />approxima[e original contour (level ground). <br />The description of the removal of all coal handling structures and the associated cost of removal <br />is given in 2.05.3 (7) Coal Handling Structures.) <br />A summary of reclamation costs is given below: <br />Removal of structures <br />• Truck dump hoppper $2,600.00 <br />Feeder 500.00 <br />36-inch conveyor 2,800.00 <br />Storage Shed 150.00 <br />Sub-[ota] $6,050.00 <br />Overburden Handline (from following page) <br />Overburden Removal 862.00 <br />Regrading 895.00 <br />Sub-total $1,757.00 <br />Total $7,807.00 <br />Time able <br />Reclamation will commence within a reasonable period af[er [he Animas Mine closes. <br />• <br />A:\8568TROI.PCS 659R Revised -November 1993 <br />/IU9l IOam <br />