Laserfiche WebLink
BN 111 LOADOUT <br /> <br />REGRADING AND OVERBURDEN REMOVAL <br />Of the 1122 cubic yards of earth excavated during construction, <br />50 cubic yards were designated for berms, which will remain <br />after reclamation. Approximately 260 cubic yards will be used <br />to fill in the trench left by removing the feeder and belt <br />stackers. The remaining 862 cubic yards will be hauled away <br />and will not be used to fill the sump area. The sump will <br />remain to provide sediment control. <br />Regrading: <br />Cat D7H dozer 7 hours x $85~hr. _ $595.00 <br />Mobilization = $300.00 <br />Overburden Handling For Reclamation: <br />(front end loader with trucks) <br />$1.00 per cubic yard x 862 yards' _ $862.00 <br />Sub-Total $1,757.00 <br />Total Regrading <br />Costs: $1,757.00 <br />L~ <br />~0 ~ <br />