Laserfiche WebLink
SANTA FE LOADOUTS <br />2.05.3 (b) Overburden <br />The following overb:.irden vol~lme~; will be e>:cavated from 'the <br />two likes during construction: <br />(1) Lease #1 310 <br />(~) Lease #2 125~~ <br />(') Hopper, Feeder Q, Belts: 260 <br />Total 1820 <br />with Iv% swell: 2093 <br />The fallowing volumes will be uses <br />construction of the sites: <br />• (1) Hopper Ramps: 1140 yard <br />3 <br />(2) Berms: 100 yard <br />3 <br />(') Roads: 853 yard <br />Total 2093 yard <br />r~ <br />yard <br />_, <br />yard <br />yard <br />yard <br />yard <br />as fill during the <br />629 <br />