My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121528
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121528
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:52 PM
Creation date
11/25/2007 9:27:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Rule 2 LOADOUTS Santa Fe #1 & #2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA FE LOADOUTS <br />Regrading and Overburden Removal <br />-------------------------------- <br />• Of the 209.' cubic yards of earth es;cavated during <br />construction, 1~~0 cubic yards were designated for <br />berms, which will remain after reclamation. <br />Appro>:imately 260 cubic yards will be used to fill in <br />the trench left by removing the feeder and belt <br />stac4;ers. The remaining 17." cubic yards will be <br />hauled away and will not be used to fill the scamp <br />areas. The sumps will remain to provide sediment <br />control. <br />Regrading: <br />S85 <br />Cat D7H dozer 8 hours >; --- = 4.684 <br />hour <br />• Mobilization = $.T_,Q 1.1 <br />Overburden removal <br />(front end loader with trucF:s) <br />$1.04 per cubic yard x 17.'~~ yd = 517:1ti <br />Sub-Total: ~271T <br />Total Reclamation Costs: $896_+ <br />• <br />628 <br />
The URL can be used to link to this page
Your browser does not support the video tag.