Laserfiche WebLink
SANTA FE LOADOUTS <br />2.05.4 Reclamation Plan <br />• According Y.o both lease agreements with the Atchison. Tope4::a and <br />Santa Fe Railway Company, the land is to be reclaimed to <br />industrial use and left as a coal loading facility. No topsoil <br />distribution and revegetation is to be undertaF::en upon closing <br />the leases. <br />At 'the request of Santa Fe, the sumps on both lease sites sha~.ild <br />remain as sediment control structures. All coal handling <br />equipment is to be removed and hauled away, and the area regraded <br />to appro;;imate original contour (level ground). <br />The description of the removal of all coal handling structures <br />and the associated cost of removal is given in 2.~~5.~ (7) Coal <br />---------------- <br />• Handling-Structures. <br />A summary of reclamation costs is given below: <br />F:emoval of structures <br />--------------------- <br />Tr~.~c4; dump hopper $ 26~?0 <br />Feeder S 500 <br />~b-inch stac4:ers $ 2800 <br />Storage shed 'G 150 <br />Coal stocF;pile $ 200 <br />Sub-total- 'B 6250 <br />• <br />627 <br />