Laserfiche WebLink
• F;XHIDi'P D - Hrclanat1on Plan <br />1. Description -. of how will handle overburden <br />Overburden will not enter into the reclamation. <br />2. Tnicknes~ of top soil to he replaced: <br />6 to B inches. <br />,3. Describe Gradient of reclaimed slope. <br />No slope will be left steeper then 4H to 1V. <br />4. Describe seeding operation <br />Seed ing will be with a grass drill. Ground will be smoothed <br />and prepared for seeding. <br />;i. Describe Grass, forb, s}-rub and tree specie: <br />Grass seed will be both buffalo and gramma. No trees <br />will be needed. None in the area. <br />f>. Describe the appllcatioa ~gjelue.d Rethod of seedinG <br />See #4 <br />~'. Describe the ~aulch: <br />Fertilizer will be applied prior to mulchin6. Mulch will <br />be with native s traw, which will probably be anchored by <br />~. Desari~~' an roads streams & <br />y ponds that will remain: <br />There will be none. <br />9. Describe how any left over rock etc, will be handled. <br />Any rock or other unsightly objects will be buried <br />prior to the grading and seeding operation. <br />10. Financial warranty for private operators: <br />Np <br />