Laserfiche WebLink
• r,Y.fiIHIT C - Minin~lan <br />~. Dates of Mining, beginning and and. <br />Mining will begin as soon as permit is received. <br />Length of mine is ind$finite as the gravel will only be used <br />for maintenance of county roads. <br />2. Description of depth of top soil & how stored. <br />Top soil is a thin sandy loam which appears to be 6 60 $ <br />inches thick. It will be stored on the west end of the <br />pit. <br />3. Description of overburden <br />The test hole does not show any overburden. Apparently there <br />is not enough underlying adobe or clay to prevent using the <br />material as soon as the top soil is removed. <br />4. Thickness of bravel layer. <br />Test hole snows gravel to be 12 to 15 fee$ thick. <br />5. Description of roads to & frog pit - Show on snap - Ex E <br />Pit is located just across the fence from Lincoln County <br />road #T-22 <br />6. Skow disturbance to land surface. <br />No disturbancd other than just taking out gravel. <br />~. Show dimensions of axiating and proposed roads that <br />will be used. <br />No road will need to be built. The pit will exit directly <br />onto tt.e bordering county road. <br />8. Spacify how such water will be used, if any. <br />None. <br />9. Describe any Ground water andjor the affect. <br />There will be no ground water. <br />10. Describe if will comply with Colorado Y~ater Laws. <br />~:ater laws will not be affected. <br />i <br />11, Describe whether bravel will be processed on site. <br />Gravel will not be processed. 4~i11 be used just as it <br />comes from the pit. <br />