Construction Quality Assurance Report
From
Cripple Creek & Victor Gold
To
DMG
Section_Exhibit Name
Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. 2 Pale 2 003-2203 <br />L230 were deployed, seamed, and tested by Poly-Flex. Destructive fusion seam samples DF-33 through <br />DF-66, were marked, removed, and tested. <br />Ames continued placement of Structural Fill (SF) in the Phase IVb area. Ames placed SF at the Phase <br />IVa/IVb tie-in and above the Phase IVb sump. Ames also continued slope recontouring in the Phase <br />IVb area on Substation Hill, on the northern PSSA slope, in the PSSA floor, on Chicken Hawk Hill, in <br />the PSSA West End Berm, and on the Phase III ore slope. Ames also placed SF into UG-493 and <br />UNK-15. <br />Ames continued construction of the Leak Detection Trench (LDT) in Phase IVb along the North slope <br />of the PSSA. Ames constructed approximately 400 feet of LDT. <br />Ames continued excavation of the interior anchor trench along the Northern limit of Phase IVb <br />PSSA in prepazation for geomembrane deployment. Ames excavated approximately 1,200 feet of <br />anchor trench. <br />Ames resumed placement of Concrete Plug (CP) concrete into "Deep Shaft" UG-493. Ames placed <br />three feet of concrete in accordance with IFC Drawing 12, Detail 1. <br />Ames placed Cemented Rockfill (CR) at UG-493 by tapering the workings and placing 7 feet of CR in <br />accordance with IFC Drawing 12, Detail 1. <br />Phase IVc <br />Ames continued placement of Coazse Shaft Backfill (CSB) into "Deep" underground working UG-270. <br />Ames resumed placement of Concrete Plug (CP) concrete into "Deep Shafts" UG-270 and UG-274. <br />Ames placed three feet of concrete in accordance with IFC Drawing 12, Detail 1. <br />Ames continued placement of Select Structural Fill (SSF) into UG-270, UG-286, and UG-291. <br />Ames constructed a geogrid cap over UNK-09. Ames placed two layers of geogdd in accordance with <br />the drawings and specifications. <br />Field Monitorine and Testine Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. Removal of oversized and deleterious material from all fill <br />azeas was observed. Golder observed Structural Fill (SF) placement in Phase IV for materials, lift <br />thickness, moisture content, and compactive effort. <br />Golder observed placement of SLF in Phase IVb for subgrade preparation, thickness, compaction, <br />moisture content, and materials. Golder conducted thirty in-situ density and moisture content tests to <br />verify SLF placed complied with the specifications. Golder observed 19 depth verification tests <br />performed by Ames. <br />rnue nrozsyms-ze.a~~ Golder Associates Inc. <br />