My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121393
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:47 PM
Creation date
11/25/2007 9:18:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
10/24/2002
Doc Name
Construction Quality Assurance Report
From
Cripple Creek & Victor Gold
To
DMG
Section_Exhibit Name
Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSOC1c1~eS <br />October 1, 2002 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />27ss state highway 67 FiECE{VE® <br />Victor, CO 80860 <br />OCT 2 4 2002 <br />12E: Summary No. 2: September 15 through September 28, 2002 Division of Minerals and Geology <br />Cresson Project Phase TUb, c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase 1Vb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of September <br />150i through September 280', 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime ]ow <br />temperatures ranged from 33° F to 44° F, and highs ranged from 54° F to 75° F. Rant was recorded <br />on September 16~, 180i, 190', 250', 260', 27e', and 280', 2002. Weather observations were made on <br />twelve days of this fourteen day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb and <br />c construction. Ames conducted Phase IVb and c construction activities on twelve days of this fourteen <br />day reporting period (September 160i through September 21~` and September 23~ through September <br />280i). <br />Phase IVb <br />Ames continued to haul and place Soil Liner Fill (SLF) in the Phase IVb PSSA and conducted 19 Depth <br />Verification Tests. <br />Poly-Flex resumed deployment of 100-mil single-sided textured (SST) LLDPE geomembrane in the <br />Phase PJb PSSA Poly-Flex deployed 100-mil SST LLDPE geomembrane over an area of 289,008 <br />squaze feet in the Phase IVb PSSA during this reporting period. Geomembrane panels LI51 through <br />
The URL can be used to link to this page
Your browser does not support the video tag.