My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121393
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:47 PM
Creation date
11/25/2007 9:18:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
10/24/2002
Doc Name
Construction Quality Assurance Report
From
Cripple Creek & Victor Gold
To
DMG
Section_Exhibit Name
Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IVb Weekly Summary No. 2 Page 3 003-2203 <br />Golder observed and documented remediation activities associated with the Phase IV underground <br />working construction. Workings were designated as Shallow or Deep as defined in the drawings. <br />Golder observed placement of SF, SSF, CSB, CP, and CR for underground working remediaion. <br />These materials were placed in accordance with the drawings and specifications into excavated or open <br />underground workings. Golder previously obtained samples of SSF, CSB, CR, and CP for laboratory <br />testing. Materials supplied met specifications. Terracon conducted field testing and sampling of CP <br />concrete as per specifications, and will supply 28-day strength results. <br />Golder observed construction of LDT in Phase IVb for trench dimensions, slope, and materials used. <br />Golder observed excavation of geomembrane anchor trench for proper dimensions and depth of SLF <br />exposed in the anchor trench. <br />Golder observed geomembrane deployment, documenting ambient air temperature, panel <br />dimensions, seaming, tie-in overlap, and seam testing (trial seams, pressure, vacuum, and <br />destructive). Geomembrane placed in Phase IVb met specifications. <br />Laboratory Tests <br />Golder obtained one sample of Structural Fill (SFb-13) and two sample of Soil Liner Fill (SLFb-03 <br />and SLFb-04) for laboratory testing. The samples tested met the requirements of the specifications <br />and results are presented in Attachment B. <br />Meetines <br />CC&V held a Weekly Contractors meetings on September 17a' and 24`s. Items discussed included <br />Safety, Environmental, Schedule, and CQA. The next weekly meeting will be held on October ls` <br />2002 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, /~~ <br />Bob Nichols <br />Resident CQA Monitor <br />Piave IVb 2 Septl S-28.Mc Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.