Laserfiche WebLink
Revision <br />February 198? <br />Design specifications will be submitted for approval before any major <br />• modifications or reconstruction is commenced. <br />~ Construction schedule <br />A construction schedule will be included which indicates beginning and <br />completion dates. <br />• Monitoring <br />Provisions for monitoring the structure will be included. <br />• Safety <br />All safety precautions required by law and good engineering practices <br />will be observed during construction. <br />• <br />(c) Conveyors and Rail System <br />The following is a description of the roads, conveyors and rail system <br />that will be maintained within the permit area. <br />i. ROADS AND CONVEYORS <br />The main haul road is Highway 133. It was designed and is maintained <br />by the Colorado Highway Department to state specifications. A 1500 foot <br />proposed haul road will connect the West Mine crusher with the truck dump at <br />the silos. Western STope Carbon also plan to re-route the access road to <br />the l•Jest Mine portal in order to lessen the grade. Section 4.03 Roads <br />provides specific information. <br />r ~ <br />LJ <br />2.05-34 <br />