Laserfiche WebLink
Revision <br />February 1982 <br />warehouse <br />wash plant and conveyors <br />shop <br />Plans <br />Plans that describe current structure condition are referred to in <br />Appendix XX. <br />Construction dates <br />Construction dates for proposed facilities have not been finalized but <br />will follow the general schedule in Section 2.05.3. <br />Design requirements <br />The structures have been designed to meet air quality standards, and <br />WSC has received an approved air quality permit from the Colorado Depart- <br />ment of Health. The Department of Health has also issued an NPDES permit <br />(Appendix X), so the quality of water discharged should not impact fish or <br />wildlife. The building designs for completed buildings were approved <br />before construction. <br />ii. COMPLIANCE PLAN <br />A compliance plan for each existing structure that is proposed to be <br />modified or reconstructed for use in connection with or to facilitate the <br />surface coal mining and reclamation operation must be submitted. The <br />compliance plan shall include: <br />• Design specifications <br />2.05-33 <br />