Laserfiche WebLink
<br />• <br />TABLE 2.05.4.8 (CONTINUED) <br />January 1981 <br />non <br />Jar.y 1982 <br /> East Portal West Portal <br />Revegetation <br />Seed Mix ($7/lb) 2Ax$50/Ax$7/lb 3Ax$50 lb/Ax$7/lh <br /> 8Ax$25/Ax$7/)b $ 2,100 14Ax$25 lb/Ax$7/lb $ 3,500 <br />Seeding 3 hr STx$25/hr 5 hr STx$25/hr <br /> 16 hr Lx$13/hr $ 283 16 hr Lx$13/hr $ 333 <br />Fertilization 3 hr STx$25/hr 5 hr STx$25/hr <br />($0.38xy20/A) 8 hr Lx$13/hr $ 366 8 hr Lx$13/hr $ 553 <br />Mulch $11,732 materials $18,480 materials <br />ro 3 hr STx$25/hr 5 hr STx$25/hr <br />° 6 hr HBx$25/hr $11,957 12 hr HBx$25/hr $18,905 <br />~ Monitoring $ 4,000 $ 4,000 <br />Subtotal $73,771 $124,521 <br />TOTAL $198,292 <br />* Costs are based on following equipment prices (determined January 1981 <br />D8 Dozer (D8) - $65/hr Small Tractor (ST) - $25/hr <br />Roadgrader (RG) - $35/hr Hay Blower (HB) - $25/hr <br />Front-end Loader (FEL) - $50/hr Labor (L) - $13/hr <br />Dump Truck (DT) - $35/hr <br />+ seed drill <br />+ disk <br />+ fertilizer <br />+ crimper <br />