Laserfiche WebLink
• <br />TABLE 2.05.4.8 <br />ESTIMATED RECLAMATION COSTS* <br />January 1981 <br />East Porta <br />Removal of Facilities <br />Buildings $25,000 <br />Debris 8 hr FELx$50/hr <br /> 8 hr DTx$35/hr $ 680 <br />Portals and Shafts $ 5,000 <br />Backfilling, Grading, 48 hr D8x$65/hr <br />Ripping 16 hr RGx$35/hr $ 3,680 <br />N <br />o Construction of <br />3 <br />hr <br />DSx$65/hr <br />" Watercourses 2 hr DTx$35/hr <br />~ 72 hr Lx$13/hr <br /> $2,000 for materials $ 3,201 <br />Topsoil <br /> 15,052 yd3 topsoil <br />Loading and Hauling 50 hr FELx$50/hr <br /> 367 hr DTx$35/hr $15,660 <br />Distribution 4 hr D8x$65/hr <br /> 16 hr RGx$35/hr $ 820 <br />Waterbar 8 hr STx$25/hr <br /> 16 hr Lx$13/hr $ 408 <br />Sacrification 8 hr STx$25/hr <br /> 32 hr Lx$13/hr $ 616 <br />Revi <br />Feb 1982 <br />West Portal <br />$46,000 <br />16 hr FELx$50/hr <br />16 hr DTx$35/hr $ 1,360 <br />$ 5,000 <br />80 hr <br />24 hr <br />6 hr <br />3 hr <br />144 hr <br />$6,000 <br />D8x$65/hr <br />RGx$35/hr $ 6,04C <br />DSx$65/hr <br />DTx$35/hr <br />Lx$13/hr <br />or materials $ 8,367 <br />26,249 yd3 topsoil <br />88 hr FELx$50/hr <br />656 hr DTx$35/hr $27,36C <br />5 hr D8x$65/hr <br />30 hr RGx$35/hr $ 1,375 <br />16 hr STx$25/hr <br />24 hr Lx$13/hr $ 712 <br />24 hr STx$25/hr <br />32 hr Lx$13/hr $ 1,01E <br />