Laserfiche WebLink
<br />1 <br />1 <br /> The proposed setbacks for• this project are 30 feet for ali <br />' property boundaries except on the north where there ar•e <br /> structures and the east. R r~tir~imur~t 200 foot setback will be <br /> observed where these structures ar•e located. The mir~ir~g area is <br />' bounded on the east side by the Fulton Ditch, one of the rna~or <br /> irrigation canals in the area. R proposed setback of 100 feet <br /> will be maintained front the ditch. The ditch coritpany has been <br /> contacted regarding this rnirnng plan. The final agreement <br />' reached with the ditch cor~toariv will be forwarded when it is <br /> r•ece i ved. <br />' 7her•e are two structures on the property that belong to the <br /> owner. R 100 foot setback. is proposed for• these structures. <br /> There does not appear to be ar~y concern for• their structural <br />' integrity due to the shallow rnir~ir~d depths. <br /> Equipment ~_rsed for the raining will consist of one dragline, one <br />' 2, 000 pal lon water tri_rck, c fr•~~r~t end loaders, ore conveyor <br />system and one orocessir~g plant. <br /> Washwater from the plant site will be piped to Phase I and <br />' discharged. The lake created in F'hase I will be used throughout <br /> the operation far wash water. The fines front the washwater will <br /> be used for backfill along the North and West shorelines of F'hase <br />I. Water in the Phase I lake will be used as a recycling pond <br />for wash waters. <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />1 <br />D-3 <br />