Laserfiche WebLink
<br /> <br /> <br />1 <br />1 <br />R E C L A M A T I O N ~`L A N <br /> <br />The primary r•eclanratior~ plan fc.r- the M R~ G Fait is for the <br />establishment of twc~ stabilized lake shorelines with vegetation <br />along the banks. The r•eclamatior~ of the land will take place <br />concurrently with rnining operations as phases ar•e completed. The <br />north end of the miming area will be backfilled fc~r the possible <br />development as homesites. Rn access road will be left betweer~ <br />the two lakes. Cottonwoods that border both sides of this access <br />road will 6e preserved. <br />t Gr•adin^ <br />Grading will be carried on to create topography sirniliar to pre- <br />' rnining conditions. The shoreline will be backfilled with <br />overburden and re,7ect rnaterial to create a stable surface. The <br />slope of the lake shor•elir~e will be 3h:ly from existing pr•ound <br />' level to 1~ feet below the water surface. p ch:iv slope will be <br />formed below 10 feet of the water surface to the bottom of the <br />pit. No highwalls will be left on the site. (See Fig~_rr•e E-1) <br />' 6ackfilling will occr_rr as each mining phase is completed. The <br />rnining timetable is given ire Ta61e D-1 crf Exhibit D. Gr•adinq <br />will be continuous acid uniform, performed in a manner to minimize <br />' erosion and siltation. The washing pond created in phase I will <br />not be graded immediately after mir~ir~g. If it is not completely <br />backfilled from washing of mined material upon completion of <br /> mining, it will also be graded to the same slopes as the rest of <br />' the pit. <br /> No acid forming or toxic producing rnaterial are known to exist ire <br />' the overburden or materials to be mined. Refuse will riot he <br /> generated or. the affected land nor• wi 11 ar~y re use e i ~ r_.~ <br /> n <br />t <br />h <br />e min e'S'S:"--Dr•ainaoe systems will be protected f rom <br />' ~ <br />. <br />~ <br />pollution by proper grading. <br /> No auger ar drill hales will be left after rnir~irig of the si te. <br />' No addits or shafts ar•e associated with this operation. <br /> Slopes will be graded to be compat ible with final land use. No <br /> swinrrning facilities are ir~cli.rded iri the reclamation plan. N one <br />' of the r•eclairned land will be used fr_.r• agricultural purposes. <br /> <br /> <br />1 <br />E-1 <br />1 <br />