My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120999
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:31 PM
Creation date
11/25/2007 8:59:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994011
IBM Index Class Name
Permit File
Doc Date
2/23/1984
Doc Name
LIMITED IMPACT OPERATION 110 [2] RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - Minin• lan (continued) • <br />West End Gravel Company <br />Page -2- <br />6. An area of approximately three hundred feet (300') <br />by three hundred feet (300') will be excavated during the first <br />phase. After the gravel has been removed, the topsoil stockpiled <br />will be placed on this area. The topsoil stockpile will be <br />approximately one hundred feet (100') in width by two hundred <br />feet (200') in length. Excavation will proceed in phases from <br />the most recently completed three hundred feet (300') by three <br />hundred foot (300') area to the next. At any time, only one <br />area will be excavated. <br />7. The existing access road to the site is twenty-five <br />feet (25') in width and approximately one-quarter (1/4) mile <br />from County Highway 90. No improvements are requierd on the <br />existing roads. <br />8. Approximately two hundred (200) gallons of water per <br />hour will be used for dust control on the site. The water will <br />come from the existing stock pond near the site, which is <br />supplied by the Doing Ditch. The water will be purchased from <br />the owner, Silver Hawk Ltd. <br />9. No groundwater will be encountered in the operation. <br />No surface water will be intercepted or disturbed. The mining <br />operation will not affect any groundwater or surface water. <br />10. No injury will occur to any existing water rights. <br />The only water used will be purchased from an existing water <br />right. No surface or subsurface water will be encountered in <br />the operation. <br />-9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.