Laserfiche WebLink
• Technical Revision (TR-32) was submitted on December 10, 1998 and provided responses to <br /> adequacy comments for the Mid-Term review. Decision-to-Approve was issued on Febmary 25, <br /> 1999. <br /> Technical Revision (TR-33) was submitted June 8, 1999 and presented the development activities <br /> for the II-W South Extension. Decision-to-Approve was issued on July 8, 1999. <br /> Technical Revision (TR-34) was submitted on April 14, 2000 and presented a revised mine plan to <br /> include auger mining. Decision-to-Approve was issued on May 17, 2000. <br />• Technical Revision (TR-351 was submitted on April 19, 2000 and added 64 acres to the disturbed <br /> area, Decision-to-Approve was issued on June 29, 2000. <br />• Technical Revision (TR-361 was submitted on May 15, 2000 and provitled the as-built certification <br /> for Haul Road H. Decision-to-Approve was issued on July 6, 2001. <br />• Permit Renewal (RN-03) was submitted on June 23, 2000 and the Decision-to-Approve was <br /> issued on June 15, 2001. <br />• Technical Revision (TR-37) was submitted on April 30, 2001 and presented the design for Haul <br /> Road L. Decision-to-Approve was issued on July 2, 2001 <br />. . Technical Revision (TR-381 was submitted on June 28, 2001 and provided the as-built certification <br /> for Pond 016. Decision-to-Approve was issued on July 30, 2001. <br />• Technical Revision (TR-39) was submitted on June 28, 2001 and provided the as-built certification <br /> for Haul Road I. Decision-to-Approve was issued on July 30, 2001. <br />• Technical Revision ITR-401 was submitted on July 30, 2001 and contained an increase of 10.5 <br /> acres of topsoil removal. Decision-to-Approve was issued on October 2, 2001. <br />• Permit Revision (PR-03) was submitted on February 4, 2002 and contained additional disturbance <br /> for mining, reclamation and related operations. Decision-to-Approve was issued on May 1, 2003. <br /> Technical Revision (TR-41) was submitted on September 12, 2002 antl presented a revised design <br /> for Pond 017. Decision-to-Approve was issued on October 4, 2002. <br />• Technical Revision (TR-42) was submittetl on February 3, 2003 and included a permanent and <br /> interim design for the Oil Well access road, the location of two additional culverts in the disturbed <br /> area, and the addition of access disturbance area at Ponds 016 and 017. Decision-to-Approve <br /> was issued on October 14, 2003. <br />• Technical Revision (TR-43) was submitted on February 20, 2003 and provided the as-built <br /> certification for Haul Road J. Decision-to-Approve was issued on March 18, 2003. <br />• • Technical Revision (TR-44) was submitted in April 2003 end summarily withdrawn. <br />PR -05 3b Revised 05/05 <br />