• Permit Revision (PR-04) was submitted on September 19, 2003 and provided an updated • <br />operations plan chat included a highwall miner, Decision-to-Approve was issued on November 17, <br />2004. <br />• Technical Revision (TR-051 was submitted on November 26, 2003 and responded to Stipulations <br />to TR-42. Decision-to-Approve was issued on November 5, 2004. <br />• Technical Revision ITR-46) was submitted on December 22, 2003 and presented revisions to the <br />backfill and grading schedules for the "A" and "B" pits. Decision-to-Approve was issued on <br />January 20, 2004. <br />• Technical Revision ITR-47) was submitted on January 7, 2004 and presented changes to the <br />Aspen Study Plan. Decision-to-Approve was issued on February 19, 2004. <br />• Technical Revision (TR-481 was submitted on March 8, 2004 and provided as-built certifications <br />for Haul Road K, Pond 016A, and Pond 006 Phase V. Decision-to-Approve was issued on August <br />20, 2004. <br />• Technical Revision ITR-49) was submitted on October 8, 2004 and presented a regrade plan for <br />the °A" piY slump, redesign of the Ridgeline Access Road, and Pond O16A capacity verification. <br />Decision-to-Approve has not been issued. <br />• Technical Revision (7R-50) was submitted on November 30 <br />2004 and <br />rovided res <br />onses to Mid- <br />, <br />p <br />p <br />Term review comments. Decision-to-Approve has not been issued. <br />• Permit Revision IPR-05) was submitted on May 6, 2005 and presented revisions to the operations <br />and backfill and grading schedule. <br />The 11-W operation is now entering the final phase of production and is expecting to produce the last <br />coals in 2006. PR-05 was developed and prepared to update the permit to allow final mining and <br />reclamation to proceed on logical and orderly schedule. <br />• <br />PR-05 3c Revised 05/05 <br />