Laserfiche WebLink
• Permit Renewal (RN-02) was submitted June 28, 1995 and Decision-to-Approve was issued on • <br />April 11, 1996. <br />Technical Revision (TR-22) was submitted on June 9, 1995 and contained modifications to the <br />haul road drainage control. Decision-to-Approve was issued on July 14, 1995. <br />Technical Revision (TR•23) was submitted on August 9, 1995 and withdrawn on October 5, <br />1995. <br />• Technical Revision ITR-24) was submitted on August 24, 1995 and presented the Phase III design <br />for Pond 006. Decision-to-Approve was issued on October 2, 1999. <br />• Technical Revision (TR-25) was submitted on April 26, 1996 and presented revisions to the post- <br />mining topography and the reclaimed drainage channels. Decision-to-Approve was issued on <br />,August 26, 1996. <br />• Technical revision (TR-261 was submitted on June 18, 1996 and addressed the woody plant <br />density standards. Decision-to-Approve was issued on August 16, 1996. <br />• Technical Revision (TR-27) was submitted on June 23, 1997 and presented a remedial action plan <br />for repairing the landslide near sediment Pond 006 and Haul Road A. Decision-to-Approve was <br />issued on July 23, 1997. <br />1997 and modified the postmining <br />tember 29 <br />itt <br />d on Se <br />i <br />TR <br />b <br />l R <br />i <br />281 <br />• <br />, <br />m <br />e <br />p <br />- <br />was su <br />• Technica <br />ev <br />s <br />on ( <br />topography in the 006 Gulch along the southwest cropline in the A Pit. Decision-to-Approve was <br />issued on November 3, 1997. <br />• Technical Revision (TR-29) was submitted on December 8, 1997 and addressed Stipulation #25 <br />and provided the Phase IV design for Pond 006. Decision-to-Approve was issued on March 13, <br />1998. <br />• 'Technical Revision (TR-30) was submitted on May 8, 1998 and provided several revised and new <br />reclaimed drainage channel designs and profiles. Decision-to-Approve was issued on September <br />3, 1998. <br />• Technical Revision (TR-31) was submitted on June 11, 1998 and presented design information for <br />Haul Road H and indicated the removal of diversion ditches 5 and 8. Decision-to-Approve was <br />issued on August 14, 1998. <br />Permit Revision (PR-02) was submitted on September 15, 1998 and addressed mining and <br />reclamation plans for the II-W South Extension area. Decision-to-Approve was issued on <br />November 4, 1999. <br /> • <br />PR-05 3a Revised 05/05 <br />