My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-03-15_PERMIT FILE - M1999033
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1999033
>
1999-03-15_PERMIT FILE - M1999033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 2:20:45 PM
Creation date
11/25/2007 8:46:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999033
IBM Index Class Name
Permit File
Doc Date
3/15/1999
Doc Name
CONSTRUCTION MATERIALS LIMITED IMPACT OPERATION RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. LOADING OUT FROM RAW MATERIAL STOCKPILE: <br /> Method of loajk2! out (frorLend loader, conveyor, etc. ) <br /> h�z�t+'f �r-�0 LoA9ER- <br /> Loading schedule: :44 tons/hour _� hours/day Coo days/year <br /> Proposed controls for loading to stockpile: No <br /> Controls include: no control, water sprays, total exposure, partial <br /> exposure, moist material, other (specify) <br /> VI. PROCESSING ^\P/N' uyE rri2h4atL OR- ye}�`)J(�Q�jcYZ��N�F <br /> will processing (i.e. , crushing, screening, etc. ) occur on site? <br /> ® Yes ❑ No (check one) <br /> NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br /> APEN (SEPARATE FORM IS ATTACHED AT END OF THS FORM - MAKE ADDITIONAL <br /> COPIES AS NEEDED) . <br /> Material loaded into processing equipment by:/ <br /> Conveyor Front end loader ✓ Other <br /> CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify <br /> moisture % if known) , water spray bars, bag filters, other <br /> (specify) , no control. If existing processing equipment will be <br /> relocated from another location complete the following sections. <br /> This equipment must already be permitted. <br /> (LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOW) <br /> A. PRIMARY CRIISHING <br /> Maximum tons crushed per year 30,0o O tons. <br /> Maximum tons crushed per hour Xo o tons. <br /> Hours of crushing per day Ox> hours. <br /> Proposed controls (see above) No C gl'n'moL- <br /> B. SCREENING/CLASSIFYING <br /> Maximum tons screened per year 30,00o tons. <br /> Maximum tons screened per hour too tons. <br /> Hours of screening per day 8 hours. <br /> Proposed controls (see above) / Ne; co+Sr2oL_ <br /> C. SECONDARY CRUSHING <br /> Maximum tons crushed per year tons. <br /> Maximum tons crushed per hour tons. <br /> Hours of crushing per day hours. <br /> Proposed controls (see above) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.