Laserfiche WebLink
D. LOADING OUT FROM RAW MATERIAL STOCKPILE: <br /> Method of loajk2! out (frorLend loader, conveyor, etc. ) <br /> h�z�t+'f �r-�0 LoA9ER- <br /> Loading schedule: :44 tons/hour _� hours/day Coo days/year <br /> Proposed controls for loading to stockpile: No <br /> Controls include: no control, water sprays, total exposure, partial <br /> exposure, moist material, other (specify) <br /> VI. PROCESSING ^\P/N' uyE rri2h4atL OR- ye}�`)J(�Q�jcYZ��N�F <br /> will processing (i.e. , crushing, screening, etc. ) occur on site? <br /> ® Yes ❑ No (check one) <br /> NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br /> APEN (SEPARATE FORM IS ATTACHED AT END OF THS FORM - MAKE ADDITIONAL <br /> COPIES AS NEEDED) . <br /> Material loaded into processing equipment by:/ <br /> Conveyor Front end loader ✓ Other <br /> CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify <br /> moisture % if known) , water spray bars, bag filters, other <br /> (specify) , no control. If existing processing equipment will be <br /> relocated from another location complete the following sections. <br /> This equipment must already be permitted. <br /> (LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOW) <br /> A. PRIMARY CRIISHING <br /> Maximum tons crushed per year 30,0o O tons. <br /> Maximum tons crushed per hour Xo o tons. <br /> Hours of crushing per day Ox> hours. <br /> Proposed controls (see above) No C gl'n'moL- <br /> B. SCREENING/CLASSIFYING <br /> Maximum tons screened per year 30,00o tons. <br /> Maximum tons screened per hour too tons. <br /> Hours of screening per day 8 hours. <br /> Proposed controls (see above) / Ne; co+Sr2oL_ <br /> C. SECONDARY CRUSHING <br /> Maximum tons crushed per year tons. <br /> Maximum tons crushed per hour tons. <br /> Hours of crushing per day hours. <br /> Proposed controls (see above) <br /> 5 <br />