My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-03-15_PERMIT FILE - M1999033
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1999033
>
1999-03-15_PERMIT FILE - M1999033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2021 2:20:45 PM
Creation date
11/25/2007 8:46:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999033
IBM Index Class Name
Permit File
Doc Date
3/15/1999
Doc Name
CONSTRUCTION MATERIALS LIMITED IMPACT OPERATION RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VIII. FINISHED PRODUCT <br /> A. LOADING INTO FINISHED PRODUCT STOCKPILE <br /> Method of loading� ` <br /> z_ in (front-end loader, conveyor, etc. ) <br /> f-ab XNt-e-R '5Rz" CTM,"Ec+�SeQ nlEac-TO VNr.,sH '55 cXklet Lr- <br /> If conveyor is used, what is maximum drop eight? C5 ft. <br /> Loading schedule: %oo tons/hour FS hours/day 6 O days/year <br /> Proposed controls Ko Cor•-rrc0 (L <br /> Controls for loading to stockpile include other (specify) , no control <br /> water sprays, total enclosure, partial enclosure, chemical suppressants, <br /> reduced drop height, telescoping chute <br /> H. FINISHED PRODUCT STOCKPILE <br /> Maximum tons stored at one time 301oo0 tons. <br /> Length of time pile remains undisturbed 4- MM NTH <br /> Proposed controls: (check appropriate boxes) <br /> ❑ Watering times/day, or continuous sprinkler (to <br /> maintain moist surface) . <br /> ❑ Chemical stabilizer (ap?lied to manufactu=is <br /> specifications) . <br /> ❑ Compacting of piles, method <br /> ❑ Enclosures: complete, or partial (check one) <br /> ❑ Revegetation, (length of time till revegetation ) <br /> ❑ Other (specify) <br /> © No control <br /> C. LOADING OUT FROM STOCKPILE FOR FINAL TRANSPORT <br /> Method of loading out (fron end loader, conveyor, etc. ) <br /> � £.Ab LA.oE.cz <br /> If conveyor is used, what is maximum drop height? ft. WA, <br /> Loading schedule: �5 tons/hour 8 hours/day coo days/year <br /> Proposed controls <br /> Controls for loading out of stockpile include Water injection, <br /> chemical dust suppressants, bag collectors, other (specify) , no control <br /> water sprays, total enclosure, partial enclosure, chemical suppresants, <br /> reduced drop height, telescoping chute. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.