Laserfiche WebLink
B. OVERBURDEN STOCKPILE N/A <br /> Maximum stored at one time tons. <br /> Length of time pile remains undisturbed <br /> Proposed control for overburden stockpile: (check appropriate boxes) <br /> ❑ Watering times/day, or continuous sprinkler (to <br /> maintain moist surface) . <br /> ❑ Chemical stabilizer (Type: ) . <br /> ❑ Compacting of piles, method <br /> ❑ Enclosures: complete, or partial (check one) <br /> ❑ Revegetation, (Length of time till revegetation ) . <br /> ❑ Other (specify) <br /> ❑ No control <br /> III. DRILLING Y O �2��►-��� O� S l?t <br /> OTHER <br /> MATERIAL OVERBURDEN ROCK COAL <br /> No, of holes drilled per day <br /> No, of days of drilling per year <br /> Hours of drilling per year <br /> Proposed controls <br /> Controls include: Water injection, chemical dust suppressants, bag <br /> collectors, other (specify) , no control <br /> IV. BLASTING T�O Ot3 St'j-E <br /> OTHER <br /> MATERIAL OVERBURDEN ROCK COAL <br /> No. of blasts per day <br /> No. of blasts per year <br /> No. of blasting days per year <br /> Proposed controls <br /> Is sequential blasting used: ❑ Yes ❑ No (check one) <br /> 3 <br />