Laserfiche WebLink
<br />n <br />u <br />(ii) The results of this application, of which this is a part, and all of the decisions formulated into it <br />constitutes what the applicant believes is an appropriate and workable Reclamation Plan. <br />3.1.2 Reclaiming substituted land: <br />Reclaiming substituted land is not a consideration or viable alternative for this plan. <br />3.1.3 Time limit and phased reduction. <br />The applicant agrees that all reclamation shall be carried to completion with all reasonable diligence, <br />and each phase shall be completed within five (5) years from the date the applicant informs the <br />Board or Office that such phase has commenced. <br />3.1.4 Public Use <br />The applicant/ owner does not propose to allow public use on this mining project in his ranch <br />holdings. <br />3.1.5 Reclamation Measures -Material Handling <br />• (1) Grading shall be carried on so as to create final topography appropriate to the final land <br />use selected as the reclamation plan. <br />(2) When backfilling is part of the plan. <br />Any backfilling of the excavated area will consist of any excess material. There are no acid-forming <br />or toxic materials that could be leached. <br />(3) All grading will be done in a manner to control erosion and siltation of the affected lands <br />from slides or other damage. If not eliminated, all highwalls, if any, shall be stabilized. <br />This is a level rangeland site and grading will not subject any of the area to erosion or siltation. <br />There will be no highwalls or potential slide azeas in this operation. <br />(4) All backfilling and grading shall be completed as soon as feasible after the mining process. <br />The applicant shall establish a reasonable timetable consistent with good mining practices and <br />reclamation procedures. <br />• <br />Page 2 of 6 <br />