My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE120479
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE120479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:12 PM
Creation date
11/25/2007 8:31:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991083
IBM Index Class Name
Permit File
Doc Date
7/18/1991
Doc Name
110 PERMIT APPLICATION
From
MLRD
To
CUSTER CNTY CONCRETE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT C <br />PROPOSED ULA PIT <br />• Page 2 <br />Water to be used in the project for dust control will be <br />obtained from a commercial well and will be transported in by <br />a wager truck. According to existing water wells in the sur- <br />rounding area, it is approximately 140 to 160 feet to water. <br />As w~~ter will not be used other than for dust control, there <br />shou:Ld be no problem with sediment containment or run-off and <br />as such no infringement or injury to any existing water rights. <br />There will be no storage of hazardous materials or chemi- <br />cals on site. Equipment will be refueled on a daily or as needed <br />basis; by pumping from a fuel truck. <br />Front end loaders and dozers will be used to do the main <br />excavation. The gravel will be processed on site by use of a <br />screen and/or crusher. There is no anticipated need for a chem- <br />ical surfacant in the processes. There will be minimal if any <br />effects to the hydrological balance of the area or surroundings. ~iK ~ <br />There will be no off-site damage, slopes will be confined to 4 :~ii//p~ <br />IC/ <br />to 1 or less so that stable configuration will remain for the <br />proposed future land use. <br />It is entirely possible that heavy snows and severe weather <br />will close operations for 6 months at a time and it is felt that <br />this permit should not be required to file a formal notice of <br />cessation in these cases. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.