Laserfiche WebLink
<br />EXHIBIT C <br />PROPOSED ULA PIT <br />• Page 2 <br />Water to be used in the project for dust control will be <br />obtained from a commercial well and will be transported in by <br />a wager truck. According to existing water wells in the sur- <br />rounding area, it is approximately 140 to 160 feet to water. <br />As w~~ter will not be used other than for dust control, there <br />shou:Ld be no problem with sediment containment or run-off and <br />as such no infringement or injury to any existing water rights. <br />There will be no storage of hazardous materials or chemi- <br />cals on site. Equipment will be refueled on a daily or as needed <br />basis; by pumping from a fuel truck. <br />Front end loaders and dozers will be used to do the main <br />excavation. The gravel will be processed on site by use of a <br />screen and/or crusher. There is no anticipated need for a chem- <br />ical surfacant in the processes. There will be minimal if any <br />effects to the hydrological balance of the area or surroundings. ~iK ~ <br />There will be no off-site damage, slopes will be confined to 4 :~ii//p~ <br />IC/ <br />to 1 or less so that stable configuration will remain for the <br />proposed future land use. <br />It is entirely possible that heavy snows and severe weather <br />will close operations for 6 months at a time and it is felt that <br />this permit should not be required to file a formal notice of <br />cessation in these cases. <br />9 <br />