Laserfiche WebLink
EXHIBIT C <br />MINING PLAN <br />PROPOSED ULA PIT <br />I <br />It is proposed to begin the excavation from this gravel ~ I~~ <br />pit during the summer of 1991 and end approximately 20 years S~~ ~ <br />later. ,~C~ `~ I1, s 1 <br />Topsoil would be placed into a long flat-topped berm to <br />the north-east of the mined area. This material, if left for <br />more than one growing season, would be seeded with the seeding <br />mixture specified in the reclamation plan in Exhibit D. Top- <br />soil in this area is not more than 6-12 inches deep, and all <br />would be stripped and placed into the berm before mining of <br />gravel would begin. <br />Overburden is of the amount to be inconsequential. The <br />deposit of material to be mined is estimated at 45 feet and <br />that is the maximum proposed mining depth. <br />'Che major components of the mining operation will consist <br />_ ~ <br />of a :50 foot access road along the east line of the sw4 of the <br />SW;, :iection 16, and storage piles of gravel immediately to <br />the e:3st of the active mining swath which will be oriented <br />east i;o west beginning about 250 feet from the north-east cor- <br />ner oP the permitted area. <br />1\t any time the size of the significantly disturbed areas <br />would be approximately 300 feet by 600 feet with about half <br />being under active reclamation activities.` <br />/\ ,i q C <br />1 (` <br />~~ <br />