Laserfiche WebLink
<br /> <br /> <br />EXHIBIT D - RECLAMATION BOND CACULATION (conintued) <br />TAILINGS IMPOUNDMENT & RECLAMATION 2.3 Acres <br />Site Regrading & Lime Raking <br />4 hours @ E90/hour 360 <br />Lime 6 tons @ 680/ton v6U. <br />Capillary Barrier Rock <br />6^thickness 556 yds of 1 1/2"rock 5648. <br />Rock Grading 2 hr @ 490/hr 1t70. <br />Top Soil 383 yd @ 4^ thickness 2901. <br />Trucking Rock & Soil 4576. <br />Top Soil Grading 2 hr @ i90.hr. 16U. <br />Seeding, mulching & fertilizing <br />2.3 acres @ 6550/acre 1375. <br />S'U8 TOTAL 515.900. <br />(NOTE: Semi-dump truck 552/hr - 25 t on load <br />estimate 2 hrs/load. 44 loads @ 5104 = <br />64545. for trucking <br />Purchase 363 yards soil, an additional <br />131 yards from stockpile top soil at site. <br />WYNONA DUMP <br />M[LL <br />TAILINGS IMPOUNDMENT <br />l.70µ. <br />2.200, <br />15.900 <br />TOTAL 118.804. <br />