Laserfiche WebLink
s • <br />EXHIBIT U - paragraph 1 <br />RECLAMATION BOND CALCULATIONS <br />GOLD HILL MILL <br />The .25 of an acre associated with the disturbed Wynona <br />dump )ust to the southeast of the mill building should <br />require: <br />2 hours regrading @ 670/hour 140. <br />50 Yards top soil @ fl4iyard 700. <br />24 hours for ~ S35/hour 664. <br />for spreading and grading of indigenous <br />type top soil, extraction and trans- <br />plantation of targeted Conifers (16 <br />Pinus Ponderosa) and brush (7 Juniperus <br />Communis) as well as seeding with two <br />types of grasses that are found to be <br />compatible for growth in the Andromeda <br />Revegetation Plot Juxtaposed to the <br />Wynona Dump. <br />SUB TOTAL 31704. <br />(Note: No trees or brush will be introduced to the <br />reclaimed tailings impoundment to insure no root <br />gouging of the liner.) <br />MILL BUILDING .4 acres <br />Mill Building Site Grading <br />16 hours @ 690/hour 1440. <br />Tap Soil 119 yards <br />Hauling and Grading 6 hours @ 390/hr 540. <br />Seeding, mulching & fertilizer <br />.4 acres @ 65.50/acre 220. <br />SU8 TOTAL 52200. <br />