My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE118477
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE118477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:14:10 PM
Creation date
11/25/2007 5:17:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989056
IBM Index Class Name
Permit File
Doc Date
5/12/1989
Doc Name
LETTER OF TRANSMITTAL TIMNATH PIT
From
TUTTLE APPLEGATE RINDAHL INC
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~ <br />1 the bottom of the mining area will be three to <br /> one. <br />' The mine will be operated as a dry pit end <br />~ initial operations will include rerouting the <br />i <br />existing drainage ditch end the installation <br /> of dewatering trenches around the perimeter of <br />~ ' th <br />i <br />s i <br />i <br />d <br />l <br />th <br />t <br />t <br /> e m <br />n <br />ng area <br />n or <br />er <br />o <br />ower <br />e wa <br />er <br />i ~ table. Water collected in the dewatering trenches <br /> will be returned to the Cache Le Poudre River. <br /> Scrapers will be primarily used to excavate the <br />' <br /> material, but the scrapers may, at times, be <br />If ' supplemented by loaders and/or backhoes. <br /> Stockpiling within the floodway will be <br />' minimized es much as possible. Stockpiles necessary <br /> within the floodway or flood fringe boundary <br />i <br />i ' <br />limits will be structured to have minimal effects <br /> should a flood event occur (i.e., a linear <br />1 <br />configuration parallel with the direction of <br /> flow). The overburden will be used in reclamation, <br />~ ' and <br />xc <br />e <br />ill b <br />ld if mark <br />tabl <br /> s w <br />e so <br />e <br />ess <br />e <br />e. <br />' The processing site will be located in the <br />t <br />i <br />h <br />d <br />ll <br /> southwestern port <br />y an <br />on of t <br />e proper <br />wi <br />;.. ' include the crushing and washing equipment es <br /> well as a concrete batch plant. The processing <br />' site will be wholly outside the flood fringe <br /> area. <br />{ ' Material will be transported to the processing <br /> site by scraper and stored in a surge pile until <br /> 1 ' processing through the plant. The primacy components <br /> <br />I , of the processing plant consist of a crusher, <br />screen plont, wash plant, several conveyors <br /> , <br /> ~' <br />. <br />D-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.