Laserfiche WebLink
iI' <br />' possibly en electric generating plant, scale <br /> end associated components. After processing, <br />i <br />i <br />the gravel products will again be temporarily <br /> stockpiled until used in the production of concrete <br /> or before being transported to their final <br /> destination. The wash plant will be of the closed <br />1 circuit configuration designed to conserve and <br /> recycle the process water. <br /> <br /> The batch plant located on the site will <br />~ be a technologically advanced facility with a <br />~ i <br />1 <br /> production capac <br />ty of <br />20 to 150 yards per hour. <br />~ ' <br />r The maximum height of the plant is 85 feet. <br /> A loader will place the aggregate in a bin, then <br />' conveyors will feed it into the plant. A trailer <br /> housing the controls for the plant end a lounge <br />' area for employees will be located adjacent to <br /> the plant. Initially, sanitary needs will be <br />' ' handled by portable toilet facilities. As the <br /> market in the area develops and production on <br />' the site increases, it is likely that a structure <br />~ will be erected for the plant controls and the <br />~ ' employee lounge, including a bathroom facility. <br />~ Appropriate permits will be obtained et this <br />' i <br />i <br />h <br />h <br /> time. C & M <br />s work <br />ng wit <br />e Poudre Valley <br />t <br />i ' REA regarding supplying electrical power to the <br /> processing and batch plant facilities. C & M <br />' is also working with the Ft. Collins - Loveland <br /> Water District to supply the water needs of the <br />1 ' batch plant. A trailer containing the boiler <br /> will also be located on-site adjacent to the plant. <br />t ' <br />~' D - 4 <br />